Key Statistics
- Client: Hughes Developments Ltd
- Website: www.faringdon.co.nz
- Consultant: Davie Lovell Smith (Andy Hall)
- Time Frame: 7 years (ongoing)
- Size: 1826 lots so far
A premier multi stage residential subdivision in Rolleston including 1800+ lots, external roading upgrades and utilities link to existing off site services.
The key achievements of this project are:
- Currently delivering a section per day.
- All Enable Fibre installed by BGCL Staff.
- All aggregates were crushed on site.
- All material was contained on site.
- Multiple stages progressing simultaneously
- Highly level of collaboration with key Stake holders to achieve timely delivery
Updated Feb 2021
- Earthworks: 1.09 million cubic metres
- Sanitary Sewer: 26km of Sewer Main
- Stormwater: 4690m of Stormwater sump leads
- High Pressure Water: 37km of Water Mains
- Pump Station: 2 x Pump Stations
- Roading and Footpaths: 22.1 ha of Roads