Rangiora Effluent Pump Station - Rangiora

Foundations for the Wet Well Wet Well pre cast panels Pipework into the wet well Valve Chamber with 300mm dia non return valves Control House Platform over outlet One installed pump Control panels in pump house Installed pumps Removing a pump for maintenance The completed site
sewer treatment

Key Statistics

  • Client: Waimakariri District Council
  • Website: www.waimakariri.govt.nz
  • Consultant: Waimakariri District Council Tel: 0800 965 468
  • Time Frame: 8 Months
  • Size: $0.5 million

This project was for the construction of a large wastewater pumping station for the Waimakariri District Council. A large wet well, valve chamber and pump house were constructed along with the installation and comissioning of 2 large FlyGT pumps.